Nayplio - Apartment 66sqm plot 240sqm, bedroom, levels 1, raised ground floor, under construction, constructionstage bricks, year built 2025, energy class A, living room, kitchen, bathroom, heating type: autonomous (heat pump), quiet, luminous, unobstructed view view, solar heater, external thermal insulation, elevator, garden, aluminum frames, double glazed windows, door screen, ceramic tiles floors, secure door, video doorbell, within city plan, residential zone, eastern orientation, access from asphalt, close to super market (up to 200m), close to school (up to 500m), close to market (up to 500m), close to hospital (up to 1000m), close to banks (up to 1000m). For sale is a newly built apartment (I2) under construction, with an area of 66.26 sq.m., in a privileged elevated location in the city of Nafplio. It is located on the elevated ground floor of a two-story family apartment building, with an eastern orientation and visibility throughout the area of Rhodes up to the hills of Aria with the Holy Monastery. It has a functional layout and consists of an open-plan living room with kitchen and dining room that have direct access to a spacious balcony, which offers a wonderful view combined with ample lighting in the room, a bedroom and a bathroom. The construction is located on rocky subsoil and special attention has been given to the quality of construction of its foundation and frame, with particular emphasis on its anti-seismic structure. It will have an external thermal facade of 7 to 10. It is also offered with a solar water heater, a heat pump with radiator panels for heating and air conditioners for cooling. At the same time, there will be water storage tanks. There is the possibility of choosing materials and colors internally. It is located in an organized, beautiful and quiet neighborhood, close to the local market and the central arteries of the city. It is only 250 meters from a supermarket, 600 meters from a school and the local market, 850 meters from the Hospital and 1000 meters from a bank. The construction has already been completed with a percentage of 40 - 50% and will be delivered no later than the beginning of 2027.