This description has been translated automatically by Google Translate and may not be accurate
reference: EK-9391331
11/12/2020 we paid all the taxes for a 3rd floor and it is mentioned in the Contract (which means the Buyer can immediately proceed with the Construction of a 3rs floor). The engineer informed us that additional 400m² can be built on the top of this building.