Property Code: 1-12 - Apartment FOR SALE in Kalamaria Center for € 415.000 . This 125.00 sq. m. Apartment is on the 4 th floor and features 3 Bedrooms, an open-plan kitchen/living room, bathroom and a WC. The property also boasts Heating system: Heat pump, tiled floor, view of the Open horizon, Window frames: Aluminum - Sliding, Security door, elevator, accessibility for people with disabilities, a storage unit sqm, electric car charging facilities, pre-installation for A/C, alarm system, pre-installation for alarm system, insect screens, double-glazed windows, triple-glazed windows, intercom TV, open space. The building was constructed in 2025 . Building Energy Rating: A+ Distance from sea 1500 meters, Distance from nearest airport: 8000 meters, Nearest metro station at 300 meters.
Excellent apartment, fourth floor, modern and luxurious construction, total area 125 sq m gross and 95 sq m net, in the area of Kalamaria. The property, which is under construction, is of energy class A+, is located close to a bus stop, bakery, local market, as well as a super market and schools, while its distance from the metro stop is only 300 meters. It is bright, airy and sunny. Its layout consists of a spacious open-plan living room and kitchen, three bedrooms, a master bathroom, which will have a modern design shower and a wc, for the needs of visitors. The floors are planned to be covered with high-quality granite tiles, the external frames will be sliding aluminum, heavy-duty, double glazed, equipped with mosquito nets and the entrance door will be security armored one. The heating of the property will be achieved by using a heat pump. The complete installation of fire detection and video intercom is planned, as well as the pre-installation of an alarm and air conditioning. An exclusive parking space in the building's pilot house, as well as a storage room in the basement will belong to the apartment. Finally, an independent supply for charging an electric car will be installed on the ground floor. The completion of the property is expected in mid-2027.